How Long Does Rendering Take?

A one-coat monocouche job is usually 4 to 7 days on site. A base coat with a silicone or acrylic finish takes longer, because the base coat is left about two weeks to cure first. Render shouldn't go on below 5 °C, in rain, or in strong sun and wind.

Day by day on site, why the weather matters, and the driest months where you live.

Free, no obligation. One local contractor prices it, not five.

  • 4–7 dayson site for a one-coat render
  • 5 °Cthe coldest day render should go on
  • 1,288 mmIreland's average rain a year
  • Springthe driest season

See your house rendered, then get a price

Upload a photo of the front of your house, pick the finish and the colour, and see it on your own walls in about a minute. Your request goes to one rendering contractor who covers your county.

Step 1 of 3

No photo handy?

A typical job, start to finish

StageTypical timeWhy
Scaffold up, walls prepared1–2 daysHacking off, cleaning, beads
Base coat and mesh1–2 daysThen it's left to cure
CuringDays to two weeksThin-coat makers ask for about two weeks on a base coat
Finish coat1–2 daysEach wall in one go, no joins
Scaffold down1 dayAfter a final check

Render is a wet trade. It shouldn't go on below 5 °C, in rain, or in hot sun and strong wind that dry it too fast. Ireland gets 1,288 mm of rain a year on average; spring is the driest season and winter the wettest. A good contractor books outside work for a settled spell and sheets the scaffold.

The driest months where you live

Met Éireann 1991–2020 averages, for each county's largest town.

CountyTownRain a yearDriest three monthsWettest month
CarlowCarlow906 mmMay to JulyOctober
CavanCavan1,042 mmApril to JuneDecember
ClareEnnis1,288 mmApril to JuneDecember
CorkCork city1,109 mmMay to JulyDecember
DonegalLetterkenny1,320 mmApril to JuneDecember
DublinDublin city centre753 mmFebruary to AprilNovember
GalwayGalway city1,289 mmApril to JuneDecember
KerryTralee1,357 mmApril to JuneNovember
KildareNaas871 mmMarch to MayNovember
KilkennyKilkenny876 mmMarch to MayOctober
LaoisPortlaoise938 mmMarch to MayOctober
LeitrimCarrick-on-Shannon1,127 mmApril to JuneDecember
LimerickLimerick city1,044 mmApril to JuneDecember
LongfordLongford1,019 mmMarch to MayDecember
LouthDrogheda831 mmFebruary to AprilNovember
MayoCastlebar1,458 mmApril to JuneDecember
MeathNavan869 mmMarch to MayNovember
MonaghanMonaghan989 mmApril to JuneDecember
OffalyTullamore900 mmMarch to MayOctober
RoscommonRoscommon1,098 mmApril to JuneDecember
SligoSligo1,253 mmApril to JuneDecember
TipperaryClonmel1,032 mmApril to JuneNovember
WaterfordWaterford city1,020 mmMarch to MayOctober
WestmeathAthlone933 mmMarch to MayDecember
WexfordWexford town1,021 mmApril to JuneOctober
WicklowBray896 mmMay to JulyNovember

Every guide, calculator and county page

Jump straight to any specification guide, our interactive calculator, the technical glossary or your county page.

Questions we get asked

How long does it take to render a house?

A one-coat monocouche job is usually 4 to 7 days on site. A base coat with a silicone or acrylic finish takes longer, because the base coat is left about two weeks to cure first. Render shouldn't go on below 5 °C, in rain, or in strong sun and wind.

What's the best time of year for rendering?

Late spring and summer. Render needs dry days above 5 °C to cure, and rain on a fresh coat washes it out or leaves it patchy. Autumn and winter jobs go ahead in dry spells, with the scaffold sheeted.

Can you render in winter?

In a dry spell above 5 °C, with the scaffold sheeted, yes. Frost on a fresh coat ruins it, so no work when frost is due.

How long before render can get wet?

Ask the contractor for the product they use. A fresh coat has to be kept out of the rain until it has set.

How long before I can paint sand and cement render?

Once it has fully cured: weeks, not days. Paint too soon and it traps moisture.